Most of every molding cycle is spent waiting. After the mold fills, the part has to cool before it can come out. Industry sources put cooling at about half to 80% of the total cycle.
That waiting time shows up in your part price. In plastic injection molding, cycle time decides how many parts a press makes each hour. Cutting even a few seconds per cycle adds up over a long production run.
This guide shows you how to calculate cycle time in injection molding. We’ll give you a simple formula and walk through one worked example. A good estimate helps you check a quote, plan your production volume, and spot design changes that save time.
To calculate injection molding cycle time, add up the time for each step in one cycle:
Cycle time = fill time + pack/hold time + cooling time + mold open, eject, and close time
Most cycles take anywhere from a few seconds to about two minutes. To find parts per hour, divide 3,600 by your cycle time. Then multiply by the number of cavities in the mold.
One cycle runs from the start of one shot to the start of the next. Every second in between counts toward your cycle time. Each cycle has four main steps.
| Step | What happens | Share of the cycle |
| Fill | The press injects molten plastic into the mold. | Small, often just a few seconds |
| Pack/hold | The press holds pressure while the gate freezes. | Short, depends on wall thickness and gate size |
| Cooling | The part cools in the closed mold until it’s solid enough to eject. | Largest, about half to 80% |
| Mold open, eject, and close | The mold opens, pushes the part out, and closes again. | Short, depends on press speed and part size |
Cooling takes the most time because plastic gives up heat slowly. That makes it the best place to look for time savings. For a closer look at what happens in each step, read our guide to the 4 stages of injection molding.
Now that you know what happens in each step, here’s how to put numbers on them.

Start with the total formula from above. Add the time for fill, pack/hold, cooling, and mold motion. Three of those steps come from the press and the mold. Cooling takes a little math.
Most engineers use a standard equation to estimate cooling time:
Cooling time ≈ (s² ÷ (π² × a)) × ln[(4 ÷ π) × (Tm − Tw) ÷ (Te − Tw)]
Enter wall thickness in millimeters and thermal diffusivity in mm²/s. The answer comes out in seconds. “ln” is the natural log button on most calculators.
Here’s what each letter means in plain words:
| Symbol | What it means | Where to find it |
| s | Wall thickness at the part’s thickest wall | Your part drawing |
| a | Thermal diffusivity, or how fast heat moves through the plastic | Resin datasheet or material supplier |
| Tm | Melt temperature, or how hot the plastic is going in | Resin datasheet |
| Tw | Mold temperature, or how warm the mold steel is kept | Resin datasheet (recommended range) |
| Te | Ejection temperature, or how cool the part must be before it comes out | Often the heat deflection temperature (HDT) on the resin datasheet |
Look at the “s²” in the equation. Wall thickness is squared, so it has the biggest effect on cooling time. If you double the wall, cooling takes about four times as long.
Most datasheets don’t list thermal diffusivity. You can work it out by dividing thermal conductivity by density times specific heat. Your material supplier can give you any values that are missing.
Fill, pack/hold, and mold motion times depend on the press and the mold. They are set on the press and confirmed during T1 and T2 mold trials. Add them to your cooling time to get the full cycle.
A formula is easier to follow with real numbers. Let’s run one.
Let’s run the numbers for a simple ABS part. It has a 2.5 mm wall and runs in a 4-cavity mold. We’ll use these values for the cooling equation:
| Input | Value |
| Wall thickness (s) | 2.5 mm |
| Thermal diffusivity (a) | 0.11 mm²/s (typical ABS range is about 0.08–0.11) |
| Melt temperature (Tm) | 240°C (464°F) |
| Mold temperature (Tw) | 60°C (140°F) |
| Ejection temperature (Te) | 83°C (181°F) |
First, work out the cooling time one piece at a time:
Next, add the other steps. For this example, we’ll pick times that fall inside typical published ranges:
| Step | Example time | Typical range |
| Fill | 1.5 seconds | 0.5–5 seconds |
| Pack/hold | 4 seconds | 2–15 seconds |
| Cooling | 13.2 seconds | From the equation |
| Mold open, eject, and close | 5 seconds | 2–10 seconds |
| Total cycle time | about 24 seconds | |
| Shots per hour | 3,600 ÷ 24 = 150 | |
| Parts per hour (4 cavities) | 150 × 4 = 600 |
Cooling is more than half of this cycle. That’s why wall thickness and mold cooling matter so much.
How does that compare with a real part? RJG, an injection molding training and technology company, published a test on an ABS tensile bar about 3.3 mm thick. Its full cycle ran 21.43 seconds, with 10 seconds of cooling and 8 seconds of pack/hold. That total is close to our example, but real numbers always shift once the mold runs on the press.
Once you know your parts per hour, you can estimate your price.
Most injection molding cycles take anywhere from a few seconds to about two minutes. Where your part lands depends mostly on wall thickness, size, and material.
| Part type | Examples | Typical cycle time |
| Thin-wall, high-volume parts | Packaging, caps, closures | 2–10 seconds |
| General engineering parts | Enclosures, brackets, housings | 15–45 seconds |
| Thick or large structural parts | Automotive and industrial parts | 60–120+ seconds |
Be careful with any single “average” cycle time. Two parts of the same size can run very differently if one has thicker walls. A 4 mm wall takes about four times as long to cool as a 2 mm wall. Only your own part’s numbers tell you what your cycle will be.
Your number will differ from the example. Here’s why.
Several things push your cycle time up or down. Some come from the part design. Others come from the mold and the press.
Your press also needs to be the right size for the job.

The fastest cycle is not always the best cycle. The goal is to cut time while every part still meets spec. These changes give you the most room to do that.
Watch out for cutting cooling time too far. A part that comes out before it’s rigid can warp. Rushed cooling around thick sections can also leave sink marks. A few extra seconds of cooling costs less than a bin of scrap.
The formula gives you a solid starting point. Real numbers come from mold sampling and testing, when the mold runs and the process is dialed in.
Cycle time has the biggest total impact in high-volume production. A few seconds per shot turns into hours of press time over a long run. That time shows up in your part price.
Founded in 2011, Freeform Polymers is an ISO 9001:2015 certified shop serving businesses across Utah and the surrounding areas. Our team builds molds and runs production, so we can talk through your part with you.